Commissioning Acceleration
OZ Designerv1.4.0-beta
OZ Designer now validates capture policies against venue geometry before installation. Teams can verify that every required shot is achievable from the planned camera positions, before any hardware ships to site.
Improved
- Pre-installation validation of capture policies against venue geometry
- Reduced install risk by identifying coverage issues during planning
- Higher first-attempt success rates during commissioning
- Commissioning timeline reduced from days to hours
Setup drift (the gap between what was planned and what gets deployed) is the main source of commissioning delays. Validating the policy against the venue model before installation eliminates drift and compresses the commissioning window.